> For the complete documentation index, see [llms.txt](https://help.supplyd.co/llms.txt). Markdown versions of documentation pages are available by appending `.md` to page URLs; this page is available as [Markdown](https://help.supplyd.co/supplyd-erp/production/creating-and-performing-a-breakdown.md).

# Creating & Performing a Breakdown

The **Breakdown** feature in Supply’d’s Production module allows you to split a single product into multiple individual items. The original product, the **Source Stock**, is treated as one unit, and when processed, it is divided into its component products, the **Yielded Products**. Unlike a Production product (see [Creating a Production Product](/supplyd-erp/production/creating-a-production-product.md) and [Creating & Performing a Production Run](/supplyd-erp/production/creating-and-performing-a-production-run.md)), you are dividing an existing item rather than creating something new. This one-step process is ideal for businesses such as butchers or oil producers, where a single item is transformed into several usable products.

Here's a few examples where this feature may be useful :&#x20;

**Butcher**&#x20;

* Input: whole chicken.
* Output: Various cuts (eg. wings, breasts, maryland).
* Breakdown allows accurate tracking of source and yield inventory.

**Oil Producer**

* **Input:** Bulk seeds or raw oil.
* **Outputs:** Refined oil, meal, husk, waste.
* **Why it’s useful:** Splits raw input into sellable products and by-products.

Breakdown products help manage inventory when bulk items are received, allowing you to track the quantities of each yielded product accurately in Supply’d.

Creating & performing a Breakdown in Supply’d allows you to manage the process of converting bulk or grouped stock into smaller, usable inventory units. This ensures stock is correctly counted, correctly labelled, and available in the right unit of measure for fulfilment and sales.

Each breakdown is recorded step-by-step so you can maintain accurate inventory control, traceability, and storage organisation.

{% hint style="warning" %}
Before creating a breakdown make sure the product exists as a **Breakdown Product**. If it doesn’t, you’ll need to create it first.&#x20;

👉 See [Creating a Breakdown Product](/supplyd-erp/production/creating-a-breakdown-product.md) for details on how to do this.
{% endhint %}

This document takes you through the process of performing a **Breakdown**.&#x20;

* [#the-production-page](#the-production-page "mention")
* [#creating-a-breakdown](#creating-a-breakdown "mention")
* [#performing-a-breakdown](#performing-a-breakdown "mention")
* [#completed-breakdown-details](#completed-breakdown-details "mention")
* [#additional-options-before-completion](#additional-options-before-completion "mention")
* [#additional-options-after-completion](#additional-options-after-completion "mention")
* [#bulk-actions](#bulk-actions "mention")
* [#editing-a-breakdown](#editing-a-breakdown "mention")
* [#filtering-the-production-runs-list](#filtering-the-production-runs-list "mention")

***

## The Production Page

Selecting **Production** in the main menu will open the **Production** page.&#x20;

![](/files/g2dhhNUypgclaWCSYby5)

You'll see two tabs on this page:

**Up Next**

The **Up Next** tab shows **Production Runs**, including **Breakdowns**, that are either in progress or scheduled. The current stage of each batch is clearly shown using colour coding for easy identification.

{% hint style="success" %}
Because Breakdown Products only have a single stage, this stage will be called <img src="/files/DYGUsEorlRu0hsFASL2N" alt="" data-size="line">, making it easy to identify all breakdown-related products and processes at a glance.
{% endhint %}

**Completed**

The **Completed** tab shows any completed runs or breakdowns.&#x20;

***

### Breakdown Details

Clicking on a **Breakdown** will open a page showing all the details of that breakdown.

<figure><img src="/files/dqzViFB6SJvBzJsgEDyG" alt=""><figcaption></figcaption></figure>

<figure><img src="/files/fn4cccOaxs7gFR0wYUYs" alt="" width="563"><figcaption></figcaption></figure>

<figure><img src="/files/dqzViFB6SJvBzJsgEDyG" alt=""><figcaption></figcaption></figure>

{% hint style="success" %}
To open or close the sections on this form, click the little arrows to the right of the titles (as circled in red above).
{% endhint %}

<figure><img src="/files/dqzViFB6SJvBzJsgEDyG" alt=""><figcaption></figcaption></figure>

* **Source Stock**: The item to be, or that is being, broken down.
* **Scheduled Date**: The date the batch is being, or that will be, created.
* **Location:** Breakdown location.
* **Batch Qty:** The quantity to be produced.
* **Expected/Current Yield:** The amount of items to be, or is currently being, produced in this batch.
* **Current Stage**: Current stage this batch is in. A Breakdown product only has a single stage, so this will be <img src="/files/DYGUsEorlRu0hsFASL2N" alt="" data-size="line">.

#### Sections:

* **Recipe**: The **Source Stock** consumed in the batch. You will also be able to auto-assign batches for the **Source Stock**.
* **Stage Instructions:** Any instructions that have been added for completing the breakdown.
* **Labour Tracking**: This will show who is assigned to the breakdown and the time taken to complete it. A timer is also included for accurate tracking.
* **Production Yield:** This shows both the expected yield and the actual yield.&#x20;
* **Production Fields & Notes:** You will be able to view and update any custom fields and add any notes related to this breakdown. \
  👉 These custom fields can be created in the [Production Settings](/supplyd-erp/settings/production-settings.md).

{% hint style="info" %}
This page will be discussed in more detail in the [#performing-a-breakdown](#performing-a-breakdown "mention") section below.
{% endhint %}

***

### Additional Options

Clicking on the 3 dots in the top right of the **Production** page will open a menu with additional options.&#x20;

<figure><img src="/files/8JtUbmKdkyvr0IIU2t9q" alt=""><figcaption></figcaption></figure>

These options are explained in the [Creating & Performing a Production Run](/supplyd-erp/production/creating-and-performing-a-production-run.md#additional-options) section of the [Creating & Performing a Production Run](/supplyd-erp/production/creating-and-performing-a-production-run.md) document.

***

## Creating a Breakdown

{% hint style="warning" %}
Before creating a breakdown, ensure:

* The **Source Stock** product and **Yielded Products** exist in Supply’d as inventory items.
* The **Source Stock** product has been correctly set up with **Breakdown Items** (Yielded Products).
* The correct unit of measure (kg, g, l, ml, etc.) is set.
* You have received or identified the bulk stock to be broken down.
* Storage locations are available for the resulting stock.
  {% endhint %}

{% stepper %}
{% step %}

#### Go to the Production Page

Select **Production** from the main menu. The **Production Runs** list will appear.&#x20;

<figure><img src="/files/dqzViFB6SJvBzJsgEDyG" alt=""><figcaption></figcaption></figure>

<figure><img src="/files/1SV2v3BpNttBUdN44VOg" alt=""><figcaption></figcaption></figure>

<figure><img src="/files/dqzViFB6SJvBzJsgEDyG" alt=""><figcaption></figcaption></figure>

***

{% endstep %}

{% step %}

#### Click Add +

Click **Add +** in the top right corner.&#x20;

<figure><img src="/files/H3AEUouhiWQVIoDVzMUP" alt=""><figcaption></figcaption></figure>

<figure><img src="/files/4fhQ5iXX34RGgLQ0yloX" alt=""><figcaption></figcaption></figure>

<figure><img src="/files/H3AEUouhiWQVIoDVzMUP" alt=""><figcaption></figcaption></figure>

The **Add Production Batch** form will show.

<figure><img src="/files/H3AEUouhiWQVIoDVzMUP" alt=""><figcaption></figcaption></figure>

<figure><img src="/files/FKNLR2WdAisbHK6AHRmg" alt=""><figcaption></figcaption></figure>

<figure><img src="/files/dqzViFB6SJvBzJsgEDyG" alt=""><figcaption></figcaption></figure>

**Product\* \[required field]**

Enter or select the breakdown **Source Stock**. Clicking on or typing in the field will bring up a list of your products to choose form. &#x20;

For our example below, we will be breaking down 10kg of chicken, so we will select “**BC01 - Beefy Betty - Big Chicken 10kg x unit**”.

<figure><img src="/files/dqzViFB6SJvBzJsgEDyG" alt=""><figcaption></figcaption></figure>

<figure><img src="/files/5Hp3XkthplxHSfj1C3h9" alt="" width="563"><figcaption></figcaption></figure>

<figure><img src="/files/dqzViFB6SJvBzJsgEDyG" alt=""><figcaption></figcaption></figure>

After selecting the product, additional fields will appear.

<figure><img src="/files/dqzViFB6SJvBzJsgEDyG" alt=""><figcaption></figcaption></figure>

<img src="/files/7JsIN4ISlqOPaSVkn82c" alt="" width="563">

<figure><img src="/files/dqzViFB6SJvBzJsgEDyG" alt=""><figcaption></figcaption></figure>

Complete the sections as per the guidelines below:

<figure><img src="/files/dqzViFB6SJvBzJsgEDyG" alt=""><figcaption></figcaption></figure>

***

{% endstep %}

{% step %}

#### Allocation

<figure><img src="/files/dqzViFB6SJvBzJsgEDyG" alt=""><figcaption></figcaption></figure>

<figure><img src="/files/N5v4vOSYTA1IvHoUIbwK" alt=""><figcaption></figcaption></figure>

<figure><img src="/files/dqzViFB6SJvBzJsgEDyG" alt=""><figcaption></figcaption></figure>

**Production Date\* \[required field]**

Select the date the breakdown will commence. Clicking this field will bring up a calendar where you can select the month, year and day.

<figure><img src="/files/dqzViFB6SJvBzJsgEDyG" alt=""><figcaption></figcaption></figure>

<figure><img src="/files/jrNHRjA1K2uoMeziGO7T" alt="" width="375"><figcaption></figcaption></figure>

<figure><img src="/files/dqzViFB6SJvBzJsgEDyG" alt=""><figcaption></figcaption></figure>

**Production Location\* \[required field]**

Select the location where the breakdown is being performed and will be subsequently stored in inventory on completion.&#x20;

<figure><img src="/files/dqzViFB6SJvBzJsgEDyG" alt=""><figcaption></figcaption></figure>

<figure><img src="/files/uh6OQkfPTbRrZ9JSGrAs" alt="" width="375"><figcaption></figcaption></figure>

<figure><img src="/files/dqzViFB6SJvBzJsgEDyG" alt=""><figcaption></figcaption></figure>

{% hint style="success" %}
👉 See the [Locations](/supplyd-erp/settings/locations.md) document for details on adding locations to Supply'd.
{% endhint %}

<figure><img src="/files/H3AEUouhiWQVIoDVzMUP" alt=""><figcaption></figcaption></figure>

**Assigned To**

Select the user(s) this breakdown associated to.&#x20;

{% hint style="info" %}
If no user is selected when creating a breakdown, the system will automatically display the name of the person currently logged in on the device during the breakdown.
{% endhint %}

{% hint style="success" %}
👉 See the [Users](/supplyd-erp/settings/users.md) document for details on adding users to your Supply'd account.
{% endhint %}

<figure><img src="/files/H3AEUouhiWQVIoDVzMUP" alt=""><figcaption></figcaption></figure>

***

{% endstep %}

{% step %}

#### Batch Details

<figure><img src="/files/H3AEUouhiWQVIoDVzMUP" alt=""><figcaption></figcaption></figure>

<figure><img src="/files/dZid1g06Y0hArsM2Qeem" alt=""><figcaption></figcaption></figure>

<figure><img src="/files/dqzViFB6SJvBzJsgEDyG" alt=""><figcaption></figcaption></figure>

**Batch Qty**

Enter the number of batches to produce in this run. The expected yield will automatically update based on your entry.

<figure><img src="/files/dqzViFB6SJvBzJsgEDyG" alt=""><figcaption></figcaption></figure>

**Measurement**

Enter the expected measurement for the breakdown batch. This represents the total weight, volume, length, or other configured unit that will be processed during the breakdown.

For example: Breaking down one 10 kg of chicken would have a Measurement of 10 kg.

This is used as the expected quantity to be processed during the breakdown and helps compare the expected amount with the actual measurement recorded when the breakdown is completed.

<figure><img src="/files/H3AEUouhiWQVIoDVzMUP" alt=""><figcaption></figcaption></figure>

**Total Size**

The combined total size of all ingredients required for this batch. This field is automatically populated and cannot be edited.

<figure><img src="/files/gczrFjFXejYdihB3r6TH" alt=""><figcaption></figcaption></figure>

***

{% endstep %}

{% step %}

#### Advanced

Advanced settings for this production run.

<figure><img src="/files/dqzViFB6SJvBzJsgEDyG" alt=""><figcaption></figcaption></figure>

**Current Stage\* \[required field]**

This shows the current stage of the batch in production.&#x20;

<figure><img src="/files/dqzViFB6SJvBzJsgEDyG" alt=""><figcaption></figcaption></figure>

<figure><img src="/files/681KB4EoDRAWPeOWzWaT" alt="" width="375"><figcaption></figcaption></figure>

<figure><img src="/files/H3AEUouhiWQVIoDVzMUP" alt=""><figcaption></figcaption></figure>

{% hint style="info" %}
As Breakdown products only have a single stage, **Breakdown** will be the only choice.
{% endhint %}

<figure><img src="/files/dqzViFB6SJvBzJsgEDyG" alt=""><figcaption></figcaption></figure>

**Notes**

Enter any notes or comments you wish to add about this batch.

<figure><img src="/files/dqzViFB6SJvBzJsgEDyG" alt=""><figcaption></figcaption></figure>

***

{% endstep %}

{% step %}

#### Save

Click <img src="/files/gTYDKtNLl2GbBrdunADo" alt="" data-size="line"> to apply your settings and add this batch.&#x20;

<figure><img src="/files/5neOkkkD542t3UimlLag" alt=""><figcaption></figcaption></figure>

The batch will now appear in the **Production Runs** list.&#x20;

<figure><img src="/files/dqzViFB6SJvBzJsgEDyG" alt=""><figcaption></figcaption></figure>

<figure><img src="/files/nAPl9hIyXY1fpVxRQ65i" alt=""><figcaption></figcaption></figure>

<figure><img src="/files/gczrFjFXejYdihB3r6TH" alt=""><figcaption></figcaption></figure>

{% endstep %}
{% endstepper %}

***

## Performing a Breakdown

{% stepper %}
{% step %}

#### Go to the Production Page

Select **Production** from the main menu. The **Production Runs** list will appear.&#x20;

<figure><img src="/files/dqzViFB6SJvBzJsgEDyG" alt=""><figcaption></figcaption></figure>

<figure><img src="/files/g2dhhNUypgclaWCSYby5" alt=""><figcaption></figcaption></figure>

<figure><img src="/files/dqzViFB6SJvBzJsgEDyG" alt=""><figcaption></figcaption></figure>

***

{% endstep %}

{% step %}

#### Select the Production Batch

Select the Breakdown from the **Production Runs** list.&#x20;

<figure><img src="/files/5neOkkkD542t3UimlLag" alt=""><figcaption></figcaption></figure>

<figure><img src="/files/o4bQqpTQiZfTLD1qUXls" alt=""><figcaption></figcaption></figure>

<figure><img src="/files/5neOkkkD542t3UimlLag" alt=""><figcaption></figcaption></figure>

The **Breakdown** details will open, ready to begin the breakdown.

<figure><img src="/files/5neOkkkD542t3UimlLag" alt=""><figcaption></figcaption></figure>

![](/files/jbTJDHn1XEG3azJoj0E1)

<figure><img src="/files/5neOkkkD542t3UimlLag" alt=""><figcaption></figcaption></figure>

{% hint style="warning" %}
If you are using integrated **Wedderburn scales** for the breakdown, see the [Scale-Based Breakdown (with Wedderburn)](/supplyd-erp/production/scale-based-breakdown-with-wedderburn.md) document for detailed instructions.
{% endhint %}

<figure><img src="/files/gczrFjFXejYdihB3r6TH" alt=""><figcaption></figcaption></figure>

***

{% endstep %}

{% step %}

#### Recipe

The **Recipe** section shows you the **Source Stock** required for the stage.

<figure><img src="/files/5neOkkkD542t3UimlLag" alt=""><figcaption></figcaption></figure>

![](/files/3dNcriuRxKP6HAvCi7Z4)

<br>

#### Assigning a Batch

You can manually assign a batch number for the **Source Stock** you are using for the breakdown or choose to auto assign a batch.

<figure><img src="/files/VFa9xy5WwCRJ9kwB4bnA" alt=""><figcaption></figcaption></figure>

**Manually Assigning a Batch**

Click <img src="/files/hPnRtwVA0RSfhLVRwHTQ" alt="" data-size="line">. The **Assign Batch** form will appear.

<figure><img src="/files/VFa9xy5WwCRJ9kwB4bnA" alt=""><figcaption></figcaption></figure>

<figure><img src="/files/p0D8ItwInce8v1FZ3sII" alt="" width="563"><figcaption></figcaption></figure>

<figure><img src="/files/VFa9xy5WwCRJ9kwB4bnA" alt=""><figcaption></figcaption></figure>

* **Batch\* \[required field]:** Click on the field to view a list of available batches for this item. Select the batch you would like to use.\
  \ <br>

  <figure><img src="/files/KdXqYYIkSYg8twEuWz1r" alt=""><figcaption></figcaption></figure>

<figure><img src="/files/aRv3XKAQvmvtJAi2CUWm" alt=""><figcaption></figcaption></figure>

* **Batch Quantity\* \[required field]:** Add the quantity of this batch you would like to use. If there is sufficient stock in the selected batch, the **Quantity Required** will be automatically filled.

<figure><img src="/files/gczrFjFXejYdihB3r6TH" alt=""><figcaption></figcaption></figure>

Click <img src="/files/nS5bHmqcrcZ7aUKbIREC" alt="" data-size="line"> to assign the batch number.

<figure><img src="/files/5neOkkkD542t3UimlLag" alt=""><figcaption></figcaption></figure>

**Auto Assigning Batches**&#x20;

To automatically assign batches to the order on a first-in, first-out (FIFO) basis, click <img src="/files/TF0NL8nmYkJWzREugdWN" alt="" data-size="line">.

<figure><img src="/files/gczrFjFXejYdihB3r6TH" alt=""><figcaption></figcaption></figure>

{% hint style="success" %}
You can also configure batches to always be automatically assigned to a batch in the [Production Settings](/supplyd-erp/settings/production-settings.md#production-defaults) section of your [Production Settings](/supplyd-erp/settings/production-settings.md).
{% endhint %}

<figure><img src="/files/5neOkkkD542t3UimlLag" alt=""><figcaption></figcaption></figure>

***

{% endstep %}

{% step %}

#### Stage Instructions

<figure><img src="/files/VFa9xy5WwCRJ9kwB4bnA" alt=""><figcaption></figcaption></figure>

![](/files/kS1wmK39GNjdtAqsA5aB)

<figure><img src="/files/VFa9xy5WwCRJ9kwB4bnA" alt=""><figcaption></figcaption></figure>

Any instructions that have been added for the Breakdown will show here.&#x20;

<figure><img src="/files/5neOkkkD542t3UimlLag" alt=""><figcaption></figcaption></figure>

{% hint style="warning" %}
If you are tracking the time to complete this stage, open the **Labour Tracking** section. Select the user and start the timer at the beginning of this stage. (See step 5 - Labour Tracking).

Stop the timer once the stage has been completed.
{% endhint %}

<figure><img src="/files/5neOkkkD542t3UimlLag" alt=""><figcaption></figcaption></figure>

***

{% endstep %}

{% step %}

#### Labour Tracking

Tracks the time spent on the breakdown.&#x20;

<figure><img src="/files/VFa9xy5WwCRJ9kwB4bnA" alt=""><figcaption></figcaption></figure>

![](/files/aK0AV65XZceOl10F8ruT)

<figure><img src="/files/VFa9xy5WwCRJ9kwB4bnA" alt=""><figcaption></figcaption></figure>

**User**

Select the user. Click <img src="/files/zF21GwTfMZF6JPmjAGhH" alt="" data-size="line"> if you wish to add an additional user.

<figure><img src="/files/5neOkkkD542t3UimlLag" alt=""><figcaption></figcaption></figure>

**Time**

Click the stopwatch on the right to start the timer. Click it again to stop.&#x20;

You can also manually enter the time if you prefer not to use the timer or are on a shared device. Enter the time in the format "H:MM:SS".

<figure><img src="/files/5neOkkkD542t3UimlLag" alt=""><figcaption></figcaption></figure>

{% hint style="success" %}
Labour Tracking in Supply’d helps you measure the time spent on the breakdown. This makes it easier to monitor efficiency, understand true costs, and identify opportunities to improve processes.
{% endhint %}

<figure><img src="/files/5neOkkkD542t3UimlLag" alt=""><figcaption></figcaption></figure>

***

{% endstep %}

{% step %}

#### Complete the Breakdown Yield

This is the actual yield achieved compared to the expected yield for this breakdown.&#x20;

<figure><img src="/files/5neOkkkD542t3UimlLag" alt=""><figcaption></figcaption></figure>

<figure><img src="/files/SydkUPYjDPBTFuf1xTn1" alt=""><figcaption></figcaption></figure>

<figure><img src="/files/5neOkkkD542t3UimlLag" alt=""><figcaption></figcaption></figure>

**Actual Yield**

Weigh and/or count the items produced during the breakdown and enter them into the  **Actual Yield** fields. This is the quantity that was physically created after the breakdown has been completed. Until you enter an **Actual Yield**, the system will use the **Expected Yield** as the default value.

For example: You break down 10kg of chicken into the various cuts. You expected to produce 30 × 100g chicken breasts, but after breaking it down you only produce 28 breasts, so enter an **Actual Yield** of 28.

Recording the **Actual Yield** ensures inventory accurately reflects what was produced and helps identify any losses due to trimming, damage, or waste.

<figure><img src="/files/5neOkkkD542t3UimlLag" alt=""><figcaption></figcaption></figure>

**Measurement**

Enter the actual measurement recorded during the breakdown. This is typically the weight, volume, or length of the product after it has been broken down and is used to calculate the final yield where applicable.

For example: 3kg of chicken breasts is weighed after trimming and records an actual weight of 2.8kg. Enter 2.8kg (or 2,800g) as the measurement.&#x20;

Recording the actual measurement helps ensure yields are accurate, inventory reflects the quantity available after breakdown, and any losses due to trimming, evaporation, damage, or waste are correctly accounted for.

<figure><img src="/files/gczrFjFXejYdihB3r6TH" alt=""><figcaption></figcaption></figure>

{% hint style="info" %}
The unit of measurement displayed (eg. kg, g, L, m) is determined by the product's unit of measure.
{% endhint %}

<figure><img src="/files/gczrFjFXejYdihB3r6TH" alt=""><figcaption></figcaption></figure>

**Expected Yield**

This field displays the quantity the system expects to be produced based on the breakdown configuration. It is automatically calculated and cannot be edited during the breakdown.

<figure><img src="/files/5neOkkkD542t3UimlLag" alt=""><figcaption></figcaption></figure>

***

{% endstep %}

{% step %}

#### Production Fields & Notes

<figure><img src="/files/VFa9xy5WwCRJ9kwB4bnA" alt=""><figcaption></figcaption></figure>

<figure><img src="/files/K0VhF6JyEgxRB8DJ0OPt" alt=""><figcaption></figcaption></figure>

<figure><img src="/files/VFa9xy5WwCRJ9kwB4bnA" alt=""><figcaption></figcaption></figure>

Complete any custom fields and add any relevant notes for this breakdown.

<figure><img src="/files/VFa9xy5WwCRJ9kwB4bnA" alt=""><figcaption></figcaption></figure>

{% hint style="success" %}
👉 See the [Production Settings](/supplyd-erp/settings/production-settings.md) document for details on how to create custom fields.
{% endhint %}

<figure><img src="/files/5neOkkkD542t3UimlLag" alt=""><figcaption></figcaption></figure>

***

{% endstep %}

{% step %}

#### Finalise the Stage

When the breakdown is complete, click <img src="/files/WIL6kdk9smCtDl7o17JX" alt="" data-size="line">.&#x20;

You will be asked to confirm.

<figure><img src="/files/5neOkkkD542t3UimlLag" alt=""><figcaption></figcaption></figure>

<img src="/files/EsbqqkpRXByZFDAWNu3S" alt="" width="375">

<figure><img src="/files/5neOkkkD542t3UimlLag" alt=""><figcaption></figcaption></figure>

Click <img src="/files/nOhm5LNJmP000P5ILaie" alt="" data-size="line">.

<figure><img src="/files/gczrFjFXejYdihB3r6TH" alt=""><figcaption></figcaption></figure>

{% hint style="warning" %}
If you have missed tracking labour, you will receive a warning about these after clicking <img src="/files/WIL6kdk9smCtDl7o17JX" alt="" data-size="line">.

**Note:** If **Enforce Batch Tracking** is enabled in the [Production Settings](/supplyd-erp/settings/production-settings.md#batch-coding) section of your [Production Settings](/supplyd-erp/settings/production-settings.md), you will not be able to finalise this stage unless a batch has been assigned.\ <br>

<p align="center"><img src="/files/BLJHvAS1KSg7sukJexBG" alt="" data-size="original"><br><br></p>

You can finalise the breakdown without including labour costs. However, the total cost of the breakdown will not be accurate if labour is omitted.\ <br>

<p align="center"><img src="/files/pffZM8SxiRzNEG5tgnOi" alt="" data-size="original"></p>

<br>
{% endhint %}

<figure><img src="/files/5neOkkkD542t3UimlLag" alt=""><figcaption></figcaption></figure>

Any inventory batches used will be consumed after finalising. The breakdown will be marked as completed <img src="/files/8HaWl7QQ6neN248sIrH0" alt="" data-size="line"> and moved to the **Completed** list. Completed batches will be added to inventory ready to sell or consume. &#x20;

<figure><img src="/files/Vzr07tBEyf3xBgadl7Hj" alt=""><figcaption></figcaption></figure>

{% hint style="success" %}
If you need to save any changes to a stage without finalising it, click **Save Changes**. You can return to this stage later to continue or finalise it.\ <br>

<p align="center"><img src="/files/uorXvvUyh0dsON4U7mis" alt=""><br><br><br></p>
{% endhint %}

<figure><img src="/files/5neOkkkD542t3UimlLag" alt=""><figcaption></figcaption></figure>

{% endstep %}
{% endstepper %}

***

### Completed Breakdown Details

Once a **Breakdown** has been finalised, the details will open.

<figure><img src="/files/wlPeGw2YXPF6ehKLTxPe" alt="" width="563"><figcaption></figcaption></figure>

**Source Stock**

The **Source Stock** used for the **Breakdown**. This helps track the batch through inventory, sales, and any recalls.

**Location**

The storage location or warehouse where the breakdown was performed. This helps track inventory and ensures correct stock management.

**Assigned To**

The staff member this **Breakdown** was assigned to.

***

#### Production Notes

The **Production Notes** section shows any additional details associated with this breakdown, such as information from any custom fields and any notes that have been added. This may include special instructions, quality observations, or internal comments recorded throughout the process.

<figure><img src="/files/IkhyF99hxtNwouj5GDiq" alt=""><figcaption></figcaption></figure>

***

#### Cost & Margin Summary

The **Cost & Margin Summary** breaks down the costs associated with this breakdown and shows how it compares to your selling price, helping you understand the profitability of the product.

<figure><img src="/files/FOuMTRI922F3qMoHPSgB" alt=""><figcaption></figcaption></figure>

***

#### Stages Summary

The **Stages Summary** provides a detailed breakdown of the products produced, the costs and the time spent on the breakdown.

<figure><img src="/files/NXSCYu9AxNUwk2hdx7QW" alt=""><figcaption></figcaption></figure>

***

## Additional Options Before Completion

Before finalising all stages, selecting a Breakdown product from the **Production Runs** list and clicking the 3 dots on the top right will open an additional menu.

![](/files/6pcFMZACBjbza0H910P7)

### Save Stage&#x20;

This will save the Breakdown without finalising it, and is an alternative to clicking **Save Stage** at the bottom of the page.

### Finalise Stage&#x20;

An alternative to the <img src="/files/WIL6kdk9smCtDl7o17JX" alt="" data-size="line"> button, clicking this will finalise the breakdown. The breakdown will be marked as <img src="/files/8HaWl7QQ6neN248sIrH0" alt="" data-size="line"> and moved to the **Completed** list.

### Edit Production&#x20;

Allows you to edit the breakdown.&#x20;

👉 See [#editing-a-breakdown](#editing-a-breakdown "mention") below for full details.

### Remove Production&#x20;

Will remove the breakdown. You will be asked to confirm.

{% hint style="warning" %}
If the production is already mid-stage, any inventory consumed will not be automatically restored, so removing the breakdown could result in discrepancies in your stock.
{% endhint %}

***

## Additional Options After Completion

After finalising the **Breakdown**, selecting a Breakdown product from the **Production Runs** list and clicking the 3 dots in the top right will open an additional menu with fewer options than above.

<figure><img src="/files/B9sqSk5ZBnTMtXxQ54Lg" alt=""><figcaption></figcaption></figure>

***

### Print Label&#x20;

Enables you to print the label for this product if you have a template set up for it.&#x20;

👉 See [#printing-labels](#printing-labels "mention")  below for full details.

***

### Remove Production&#x20;

Will remove the Breakdown. You will be asked to confirm.

{% hint style="warning" %}
If you delete a breakdown after it’s been completed, the batch will have already been added to inventory. In that case, you will need to manually adjust your inventory.
{% endhint %}

***

### Bulk Actions

Selecting one or more items by checking the boxes next to those products, then clicking on the <img src="/files/P0RMaOtBIK9JuG8ONmrA" alt="" data-size="line"> button will give you the extra options.

<figure><img src="/files/9OMYBmigyJv6iu7yrjWk" alt=""><figcaption></figcaption></figure>

<figure><img src="/files/0JA9KoR20XZReB3KnZLC" alt="" width="375"><figcaption></figcaption></figure>

* [#download-greater-than-pick-list](#download-greater-than-pick-list "mention")
* [#export](#export "mention")
  * Sub-Recipe Runs&#x20;
  * Production Runs

{% hint style="info" %}
The <img src="/files/s4aSlSMz0hnT63OA3jqi" alt="" data-size="line"> button will stay grey until at least one item is selected. Once at least one item is selected, the button will turn green, <img src="/files/P0RMaOtBIK9JuG8ONmrA" alt="" data-size="line"> and become clickable.
{% endhint %}

{% hint style="success" %}
Use the **Filter** function <img src="/files/357dhqw020j4kNIx9XDP" alt="" data-size="line">to display only **Breakdown** products, making it easier to view and perform actions on breakdowns only.
{% endhint %}

***

#### Download > Pick List

<figure><img src="/files/Y7Hjd9mNqFinFTvm6ob3" alt="" width="375"><figcaption></figcaption></figure>

This downloads the **Production Pick List**, which contains a detailed list of all items required for the selected production runs or breakdowns. The pick list can be printed or saved as a PDF, allowing staff to gather the correct inventory before a run or breakdown begins.

<figure><img src="/files/6d45wQ5389VQxowMrDx5" alt=""><figcaption></figcaption></figure>

{% hint style="success" %}
This action is also useful for planning production-related purchases.
{% endhint %}

***

#### Export

<figure><img src="/files/BrjZVdhnYgMxkRqq556Q" alt="" width="375"><figcaption></figcaption></figure>

**Export Sub-Recipe Runs**

This is mainly used for production runs and is not applicable to breakdowns.

***

**Export Production Runs**

This option allows you to download a spreadsheet of your production runs/breakdowns. The exported file includes key details such as Product names, Locations and Batch Quantities etc. It’s useful for record-keeping, reviewing production plans, or sharing information with your team outside of Supply’d.

<figure><img src="/files/nHRAJcKb48NhhUIaTWdE" alt=""><figcaption></figcaption></figure>

***

## Editing a Breakdown

{% stepper %}
{% step %}
Prior to completion, select the breakdown product from the **Production Runs** list, click on the 3 dots on the top right, and select **Edit Production**.&#x20;

<figure><img src="/files/m3QH9eyt5OHZkiBLWubD" alt=""><figcaption></figcaption></figure>

<figure><img src="/files/c9BJPKDX1SLbTBfTwIf6" alt=""><figcaption></figcaption></figure>

<figure><img src="/files/m3QH9eyt5OHZkiBLWubD" alt=""><figcaption></figcaption></figure>

The **Edit Production Batch** page will show.

<figure><img src="/files/Vzr07tBEyf3xBgadl7Hj" alt=""><figcaption></figcaption></figure>

<img src="/files/Pt5N4FOcDyM1PR1yH0u4" alt="" width="563">

<figure><img src="/files/m3QH9eyt5OHZkiBLWubD" alt=""><figcaption></figcaption></figure>

{% endstep %}

{% step %}
Edit any fields required in the same way as [#creating-a-breakdown](#creating-a-breakdown "mention") above.&#x20;

{% endstep %}

{% step %}
Click <img src="/files/nS5bHmqcrcZ7aUKbIREC" alt="" data-size="line"> to apply changes.

<figure><img src="/files/m3QH9eyt5OHZkiBLWubD" alt=""><figcaption></figcaption></figure>

{% endstep %}
{% endstepper %}

***

&#x20;

## Printing Labels

To print labels for the product:

{% stepper %}
{% step %}

#### Select Print Label

After completion, select the breakdown product from the **Production Runs** list to open the details, click on the 3 dots on the top right, and select **Print Label**.&#x20;

<figure><img src="/files/m3QH9eyt5OHZkiBLWubD" alt=""><figcaption></figcaption></figure>

<figure><img src="/files/F35GYnUmQD8bBgwmLgCg" alt=""><figcaption></figcaption></figure>

<figure><img src="/files/m3QH9eyt5OHZkiBLWubD" alt=""><figcaption></figcaption></figure>

The **Print Label** form will open.

<figure><img src="/files/m3QH9eyt5OHZkiBLWubD" alt=""><figcaption></figcaption></figure>

***

{% endstep %}

{% step %}

#### Complete the Form

Complete the **Print Label** form as follows:

<figure><img src="/files/m3QH9eyt5OHZkiBLWubD" alt=""><figcaption></figcaption></figure>

<figure><img src="/files/bGTkzuCNQxbh8HpkUmpO" alt="" width="563"><figcaption></figcaption></figure>

<figure><img src="/files/m3QH9eyt5OHZkiBLWubD" alt=""><figcaption></figcaption></figure>

**Template\* \[required field]**

Select the template to use to generate the label for this product.&#x20;

<figure><img src="/files/m3QH9eyt5OHZkiBLWubD" alt=""><figcaption></figcaption></figure>

<figure><img src="/files/R0y4H0zoet944SG7nkgt" alt="" width="375"><figcaption></figcaption></figure>

<figure><img src="/files/m3QH9eyt5OHZkiBLWubD" alt=""><figcaption></figcaption></figure>

{% hint style="success" %}
Supply’d offers a variety of system templates for you to choose from.&#x20;

👉 For instructions on creating your own templates, please refer to the [Templating](/supplyd-erp/templating.md) document.
{% endhint %}

<figure><img src="/files/m3QH9eyt5OHZkiBLWubD" alt=""><figcaption></figcaption></figure>

**Batch**

Select the batch number to be included on the label. Select **None** to not include the batch number.

<figure><img src="/files/m3QH9eyt5OHZkiBLWubD" alt=""><figcaption></figcaption></figure>

{% hint style="success" %}
If you opened this from within a breakdown, the batch code for that breakdown will appear first by default.
{% endhint %}

<figure><img src="/files/m3QH9eyt5OHZkiBLWubD" alt=""><figcaption></figcaption></figure>

<figure><img src="/files/RyGJvUv8T8xjcrmqnf9y" alt="" width="375"><figcaption></figcaption></figure>

<figure><img src="/files/m3QH9eyt5OHZkiBLWubD" alt=""><figcaption></figcaption></figure>

**Action\* \[required field]**

Select whether to download as a PDF or print directly from a Supply'd scanner.

<figure><img src="/files/gczrFjFXejYdihB3r6TH" alt=""><figcaption></figcaption></figure>

<figure><img src="/files/x1AAvBmzIh9Yc2SkzDSe" alt="" width="375"><figcaption></figcaption></figure>

<figure><img src="/files/gczrFjFXejYdihB3r6TH" alt=""><figcaption></figcaption></figure>

**Printer\* \[required field]**

Select the printer you would like to use to print.

<figure><img src="/files/gczrFjFXejYdihB3r6TH" alt=""><figcaption></figcaption></figure>

<figure><img src="/files/qYGGf4Rh3jvnx0kGHOIA" alt="" width="375"><figcaption></figcaption></figure>

<figure><img src="/files/gczrFjFXejYdihB3r6TH" alt=""><figcaption></figcaption></figure>

**Copies\*  \[required field]**

Enter the number of labels you would like to use.

<figure><img src="/files/m3QH9eyt5OHZkiBLWubD" alt=""><figcaption></figcaption></figure>

**Sales Channel**

Select the sales channel to retrieve the carton quantity and pricing information.

<figure><img src="/files/P5kJoO3sweM7nOgujick" alt="" width="375"><figcaption></figcaption></figure>

<figure><img src="/files/gczrFjFXejYdihB3r6TH" alt=""><figcaption></figcaption></figure>

***

#### Customisation

Complete this section to optionally change the font or include extra information on the label.

<figure><img src="/files/bXG3LjSSL3mgLleO1NOO" alt=""><figcaption></figcaption></figure>

<figure><img src="/files/4Dq1PoDtGaSvcyVL68G2" alt=""><figcaption></figcaption></figure>

<figure><img src="/files/5PXWGPYM6qUtHNZadH6P" alt=""><figcaption></figcaption></figure>

{% hint style="info" %}
If left blank, only the product name and barcode will be printed.&#x20;

For price labels, the product name, price, and barcode are included by default.
{% endhint %}

<figure><img src="/files/Vzr07tBEyf3xBgadl7Hj" alt=""><figcaption></figcaption></figure>

**Font\* \[required field]**

Select the font you would like to use in this customisation.&#x20;

<figure><img src="/files/5PXWGPYM6qUtHNZadH6P" alt=""><figcaption></figcaption></figure>

<figure><img src="/files/5MOmPli5X8KEK6xktemF" alt="" width="375"><figcaption></figcaption></figure>

<figure><img src="/files/Vzr07tBEyf3xBgadl7Hj" alt=""><figcaption></figcaption></figure>

**Barcode**

Select the barcode type you want to use on the label. Choose **None** to not include a barcode.

<figure><img src="/files/5PXWGPYM6qUtHNZadH6P" alt=""><figcaption></figcaption></figure>

<figure><img src="/files/HLd4D2tOmfmiBPl1gzDp" alt="" width="375"><figcaption></figcaption></figure>

<figure><img src="/files/Vzr07tBEyf3xBgadl7Hj" alt=""><figcaption></figcaption></figure>

**Logo**

Select the logo to use on the label. Only applies to templates with utilise the logo\_image.

<figure><img src="/files/Vzr07tBEyf3xBgadl7Hj" alt=""><figcaption></figcaption></figure>

<figure><img src="/files/JJAxUAIMAfIz9PWCAvtM" alt="" width="375"><figcaption></figcaption></figure>

<figure><img src="/files/Vzr07tBEyf3xBgadl7Hj" alt=""><figcaption></figcaption></figure>

**Custom Text**

Add any custom text you would like to include on the label (maximum 20 characters). This option only applies to templates that utilise custom text.

<figure><img src="/files/Vzr07tBEyf3xBgadl7Hj" alt=""><figcaption></figcaption></figure>

***

{% endstep %}

{% step %}

#### Click Print

Click <img src="/files/hnXSzjkmClnKq4cN0EM9" alt="" data-size="line">.&#x20;

<figure><img src="/files/bXG3LjSSL3mgLleO1NOO" alt=""><figcaption></figcaption></figure>

If you have selected to **Direct Print** in the **Actions** field,you will be asked to confirm that you are ready to print the label.

<figure><img src="/files/bXG3LjSSL3mgLleO1NOO" alt=""><figcaption></figcaption></figure>

<figure><img src="/files/0zJMfoMKsS3WK1EM7BOR" alt="" width="375"><figcaption></figcaption></figure>

<figure><img src="/files/5PXWGPYM6qUtHNZadH6P" alt=""><figcaption></figcaption></figure>

Click <img src="/files/ErxfLLpxTbQ1C2IDEfbT" alt="" data-size="line">.

<figure><img src="/files/gczrFjFXejYdihB3r6TH" alt=""><figcaption></figcaption></figure>

<figure><img src="/files/gczrFjFXejYdihB3r6TH" alt=""><figcaption></figcaption></figure>

If you selected **Download PDF**, a PDF will be generated, which you can then save or print.

<figure><img src="/files/gczrFjFXejYdihB3r6TH" alt=""><figcaption></figcaption></figure>

<figure><img src="/files/PzGJo1UHoZ7nJp7hT9Rg" alt="" width="563"><figcaption></figcaption></figure>

<figure><img src="/files/gczrFjFXejYdihB3r6TH" alt=""><figcaption></figcaption></figure>

{% endstep %}
{% endstepper %}

***

## Filtering the Production Runs List

On the **Production** page, the 3 lines next to the 3 dots in the top-right corner let you filter the product list, while the magnifying glass allows you to search for specific items.

Clicking on the magnifying glass, you can search the Production Runs list by product name or brand.

![](/files/9BvAmTHPvicbzOKol4or)

Clicking the 3 lines opens the **Filter Production** form, giving you access to all available filtering options.

<div align="center"><img src="/files/cQryB8t1vi9uHdmKS5wQ" alt="" width="375"></div>

**Product**

Select a product, or products, to show only production runs for the selected product(s).

**Department**

Choose the department(s) you want to filter by to display only production runs assigned to the selected department(s).

<figure><img src="/files/K4W9NsXNKoKFQTkpdizB" alt="" width="375"><figcaption></figcaption></figure>

**Status**&#x20;

Select the status(es) that you would like to filter the list by.&#x20;

<figure><img src="/files/esogtoUU5W69k7U6icUM" alt="" width="375"><figcaption></figcaption></figure>

**Stage**&#x20;

Display runs at a particular production stage or stages. For example, if you only want to see Breakdown Products, you would select "**Breakdown**".

<figure><img src="/files/IyJHtI6KYvbAAw2dQQ17" alt="" width="374"><figcaption></figcaption></figure>

**Scheduled Date**

View runs scheduled for a specific date or timeframe. Clicking on the field opens a calendar to choose a date or date range.

<figure><img src="/files/A4RCjBhY113d8yI25oR4" alt="" width="563"><figcaption></figcaption></figure>

Click <img src="/files/ynn03CBvtwaVESCAEZEY" alt="" data-size="line"> to set the date(s).

**Assigned To**&#x20;

Select the user(s) to view runs assigned to them.

**Batch**

Enter a batch number to locate those specific batch.

Click <img src="/files/zaq2NQwHCavaIiPPZiIb" alt="" data-size="line"> to apply your selections and filter the **Products** list.

***


---

# Agent Instructions
This documentation is published with GitBook. GitBook is the documentation platform designed so that both humans and AI agents can read, navigate, and reason over technical content effectively. Learn more at gitbook.com.

## Querying This Documentation
If you need additional information that is not directly available in this page, you can query the documentation dynamically by asking a question.

Perform an HTTP GET request on the current page URL with the `ask` query parameter, and the optional `goal` query parameter:

```
GET https://help.supplyd.co/supplyd-erp/production/creating-and-performing-a-breakdown.md?ask=<question>&goal=<endgoal>
```

`ask` is the immediate question: it should be specific, self-contained, and written in natural language.
`goal` is optional and describes the broader end goal you are ultimately trying to accomplish on behalf of the user. GitBook uses it to tailor the answer towards what is most useful for that goal.

The response will contain a direct answer to the question and relevant excerpts and sources from the documentation.

Use this mechanism when the answer is not explicitly present in the current page, you need clarification or additional context, or you want to retrieve related documentation sections.